| Jalak Harupat Precast Bench |
|
Bandung city now has a stadium that we should be proud of, the name of this stadium is Jalak Harupat, precisely in the area Soreang Bandung regency. Stadium capacity is large enough to accommodate 30 000 s / d 40,000 people Stadium Construction began around June 2003 and was completed in late 2004. The stadium was built with the concept of the structure of conventional concrete columns and beams (Fig.4), the framework of the roof using steel construction (fig. 5) and using a bench seat from the production precast from PT. Beton Elemenindo Perkasa (Fig.2). Consultants for Design of Precast Seat (Bench Precast) usesQuality Concrete K-350 and the path for water flow between Precast connections with each other (fig. 3). This is to prevent leaking at the connection between the rain.
Fitting using Mobil Crane and Sling fabrics to prevent broken. (fig. 6). Joint system using the Bench Embaded Precast (Fig.1) and Embaded on Concrete Beams (Fig.7) and spliced using Iron Canal and in the weld (Fig.8).While the connection between the system with Bench Bench Precast Concrete Precast others use Fill, Elastic (Fig.9). Precast Bench expose the bottom and do not use the ceiling (fig. 11).
|